Contact
Tell us what you need.
Call for anything urgent in Chattanooga. For everything else the form below reaches us directly and we come back the same day.

Start here
What is going on?
Tell us what you have noticed and we will tell you what it usually means, how urgent it is, and what happens next. No form, no phone call to find out.
There is a stain on the ceiling Brown ring, maybe growing after rain Before the next storm
Water is entering somewhere uphill of where you see it. Flashing at a chimney, valley or vent boot is more common than the field of the roof itself.
Get this looked atIt only leaks in heavy rain Fine most of the time This month
Usually wind-driven water getting under a flashing or an undersized valley, rather than an actual hole. Diagnosable from the roof, not from the ceiling.
Get this looked atWe had hail or a big wind event Neighbours are getting roofs done Claim windows close
Hail bruising is often invisible from the ground and still shortens the roof's life. Insurance timelines are limited, so an inspection is worth doing while the claim window is open.
Get this looked atShingles are in the yard After wind This week
Missing tabs expose the underlayment and the deck. Cheap to patch now, expensive once the deck is wet.
Get this looked atThe roof is around twenty years old Original to the house, never replaced Plan ahead
Most three-tab asphalt roofs in this climate are done between 18 and 25 years. Knowing where yours sits changes whether repair or replacement is the right money.
Get this looked atThere is grit in the gutters Sandy granules collecting Worth a look
Granules are the shingle's sunscreen. Losing them accelerates everything else, and it tells you roughly how much life is left.
Get this looked atThe roofline looks wavy Dips or sagging between rafters Get it looked at
Decking that has been wet, or a structural issue underneath. This is the one where an inspection matters most, because it is not a shingle problem.
Get this looked atWater pours over the gutter edge Or runs down the fascia This season
Blocked, undersized, or pitched wrong. Left alone it rots fascia and soaks the foundation, which costs far more than the gutter did.
Get this looked atCommon causes for roofing, from experience. Yours still needs looking at properly before anyone can tell you what it will cost.
Whoever you hire
Five questions worth asking any roofer.
Including us. A company that answers these easily is telling you something, and so is one that does not.
- 01Are the crews employees or subcontractors?
- 02What happens, and what does it cost, if the deck is rotten?
- 03Is the workmanship warranty separate from the manufacturer's, and how long?
- 04Will you photograph what you find before you cover it up?
- 05Who is on site as the supervisor while the work happens?

Before you call
The questions we get asked most.
How long should my roof last?
Three-tab asphalt is typically 18 to 25 years in this climate, architectural shingle 25 to 30, standing-seam metal 40 or more. Ventilation matters as much as the shingle: a hot attic ages a roof from underneath.
Repair or replace?
If the failure is isolated and the rest of the roof still has years of granule left, repair. If the same roof has needed several repairs, or granule loss is widespread, repairs stop being economical.
How does an insurance claim actually work?
The insurer sends an adjuster, who writes a scope. A good contractor meets that adjuster on the roof and documents what the scope missed. Claim windows after a storm are limited, so an inspection early is worth more than a decision later.
What is under the shingles, and does it matter?
Decking, underlayment, ice-and-water barrier at the vulnerable points, and flashing where the roof meets anything else. Most leaks are flashing. It matters because a cheap roof usually cheapens the parts you cannot see.
What should I ask before signing?
Who is doing the work and are they employees or subcontractors; what happens if the deck is bad; what the workmanship warranty covers separately from the manufacturer's; and whether the price changes if the tear-off finds something.
Get a quote
Dry, sound, and done properly the first time.
Tell us what you need and when suits. We come back the same day.
(423) 555-0143Send it over
A name, a number, and a line about the job.
Thanks. On the real site this lands in the inbox within a second.